Service quotation
Serial number | Services/content | Unit price | Notes |
, Wall cleaning, repairs, fill gaps: | |||
1 | Glass curtain wall, aluminum plate curtain wall | 1.00-2.00 Yuan/m2 | |
2 | Glazed | 2.50-5.00 Yuan/m2 | |
3 | Marble, granite | 1.00-1.50 Yuan/m2 | |
4 | Water, sand and gravel | 2.00-3.00 Yuan/m2 | The minimum 1500 |
5 | Mosaic exterior, tile external walls | 1.00-1.50 Yuan/m2 | |
6 | Glass Windows | 2.003.00 Yuan/m2 | |
7 | Color steel plate | 2.00-5.00 Yuan/m2 | |
8 | Oil paint external walls | 1.50-2.00 Yuan/m2 | |
9 | External wall traps | 25.00 to 35.00 Yuan/㎡ | |
II, outer wall coating: | |||
10 | Old painted wall plaster, spray | 5.00-10.00 Yuan/m2 | Contractor is not material |
?11 | Old painted wall plaster, spray | 12.00-20.00 Yuan/㎡ | Contracting |
Third, the daily cleaning: | |||
12 | The time spent on the | 15.00-18.00/h | |
13 | Three times a week | 2.50 Yuan/square meters | |
14 | Five times a week | 3.5 Yuan/square meters | |
15 | Appoint professional workers (8 hours per day/one day off per week) | 1300-1500.00 Yuan/person/month | Cleaning products and cleaning tools |
16 | Area calculation | 3.50-4.00 Yuan/m2 | Contracting |
Four, a commercial cleaning: | |||
17 | The façade | Negotiable | |
18 | Lightbox signs | 30.00/m2 | |
19 | Business Office | 4.00 Yuan/m2 | The measured area |
20 | Computer cleaning | 10/set | A large quantity of Cong |
Five, property land reclamation: | |||
21 | Land reclamation | 2.5 to 4.00 Yuan/m2 | Measured area of minimum consumption of 260 Yuan/time |
22 | Cleaning | 3.00 Yuan/m2 | Minimum consumption of 260 Yuan/time |
Six, carpets, sofa cleaning | |||
23 | Man-made fibres, carpets | 1.500-2.00 Yuan/m2 | Lowest minimum spending 200 Yuan/100 sq m |
24 | Wool, velour carpet | 5.00 Yuan/m2 | |
25 | Sofa | 25.00/ | Single |
RMB 50.00/piece | Double | ||
70.00/each | Three people | ||
26 | Computer Chair cleaning | 10.00/ | Silk fiber |
27 | Bulk wool carpet | 200.00/piece | |
Seven, waxes, cleaning | |||
28 | Wood floor wax | 3.00-5.00 Yuan/m2 | At least 200 Yuan |
29 | Plastic floor waxing | 3.500-5.00 Yuan/m2 | At least 200 Yuan |
30 | Marble, stone, granite | 4.00-8.00 Yuan/m2 | At least 200 Yuan |
31 | Artificial stone, terrazzo | 4.5-8.00 Yuan/m2 | At least 200 Yuan |
32 | PVC flooring | 4.00-6.00 Yuan/m2 | At least 200 Yuan |
33 | The old floor wax | 2.00-3.00 Yuan/m2 | At least 200 Yuan |
Eight, polishing and cleaning | |||
34 | Polishing | 2.00 Yuan/m2 | |
35 | Tile flooring | 1~2.00/m2 | |
Nine, marble series | |||
36 | Marble, marble Crystal face processing | 18.00-20.00/m2 | At least 300 yuan |
37 | Marble, stone renovation | 50.00-65.00 Yuan/m2 | Minimum of 1000 Yuan |
38 | Granite renovate | 65.00-85.00 Yuan/m2 | Minimum of 1000 Yuan |
Ten, chandelier-type cleaner: | |||
39 | Family | RMB 30.00 per set | 50 public duties |
40 | Large chandelier | Negotiable | |
Third, air conditioning series: | |||
41 | Cleaning/moving/1-1.5 horse | 80/150 RMB/set | Plus: 60.00/piece |
42 | Cleaning/moving/2 | 100/200/set | |
43 | Cleaning/moving/3 | 130-250/set | |
44 | Cleaning/moving/5 | 200/450/set | |
45 | Central air conditioning | 2~3 million/millions of calories | |
12, greening services | |||
46 | Greening services | Negotiable | |
47 | Fresh flowers, potted plants and distribution | Market price | |
13, drilling | Negotiable | ? According to size | |
14, ground floor | 4.00/m2 | The measured area | |
XV, cleaning machines, tools, cleaning agent sales | |||
16, pipe | |||
48 | Dredging the sewage pipes, toilet, wash basin (small dredging machine) | 80 Yuan | Pat a week |
49 | Unclog culverts (underground oil pipe) (large-scale dredging machine) | Startup costs 120 Yuan/m 20 | Pat half a month – 1 month long contract interview |
50 | Manual cleaning manholes | Every 50-40 | Long-term contract interview |
51 | Powerful traps | Each car 80 Yuan | Other interviews for six months |
52 | Mechanical cleaning of septic tanks, oil tank, sewage pool (five-ton truck) | Each car 180 yuan | Long-term contract with pool price interview |
53 | High pressure vehicle dredge (underground oil pipe) (sewer) | 60-200 yuan per meter | Starting price 200 Yuan |
54 | Boiler | 1000 RMB/ton | |
55 | Off line | 200.00/m2 | |
17, cleaning pools | |||
56 | More than 40 cubic meters | 80 Yuan/a | Need long-term contracting interviews, frequency, length pricing |